ACCOMPLISHMENTS CONT.

  • rePAIRED WATER LINE mAY/2013

    Repaired main water line to building 1 and had all owners repair water leaks in each unit.

  • Gutters and downspouts August /2013

    Replaced gutters in front in the center of both buildings with larger gutters and added an extra downspout to each building.

  • Stained decks October/2013

    Front decks were stained a two tone color.

  • Replaced outside electrical box /May 2018

    The elctrical box on the South side of Building 1 has been replaced.  The North side of building 2 is planned for early July and the South side for early September.

  • Sealed and re-striped parking lot/June 2018

    Parking lot was sealed and re-striped
  • Electrical Box  replaced/July 2018

    The outside electrical box servicing the Northside of Building 2 was replaced

  • Repairs of both buildings/July 2018

    Numerous repairs were made on decks, gutters, drains and front siding.

  • Painting/August 2018

    Front siding and front decks on both buildings painted.  Front doors all painted the same color - dark red.

  • Trees/August 2018

    2 trees were removed and 1 tree on south end of building 1 was trimmed back due to disease.

  • Electrical Box Repair/ Sept 2018

    The outside electrical box for the South side of Building 2 was replaced

  • Dryer Vents /Sept. 2018

    All the dryer vents except for unit 9, 10, and 31 were cleaned.  These units had no one available to let the cleaners in.  They will have to make arrangements on their own to have the work done.  Along with the cleaning, many unit owners chose to replace the vent covers at the time of cleaning.

  • Building 2 roof replacement/ December 2020

    The roof on Building 2 was replaced and 1 chimney cap replaced.  The other cap did not need to be replaced.